View details of some our Contracting Projects

Tottenham Hotspur New Stadium

Construction of bespoke Sky line viewing gallery

Works included installation of:

  • Primary Steel
  • Secondary Steel
  • Glazing

Value

£500k

Twickenham Stadium

Developed, designed and installed bespoke steel structures for stunning new entrances

Works included:

  • Design and fabrication of primary, secondary and cladding systems.
  • Site logistics, lifting and assembly.
  • Detailed interior stainless steel fit – out panelling, integration of MEP services.
  • Lifting/assembly strategy in confined PC local to public, roads and foot paths.

Value

£500k

London Olympic Park, Stratford, Copper Box

New green car park with EV charging station

Works included:

  • Designed and installed electrical power supplies and substation connection for new EV chargers.
  • Civils and groundworks for foundations, data, power and comms networks infrastructure.
  • Replacement high level and wall mounted energy efficient exterior lighting.
  • Tarmac surfacing and extensive line marking.
  • New data and comms networks including reinstallation of ANPR system.

Value

£400k

Echo Packaging

Design and installation of reinforced structural slab

Works included:

  • Design and installation of high load pile foundations and reinforced structural slab.
  • Design and installation of new connection frame for process material silo.
  • Management and lift planning for Silo relocation.

Value

£80k

Abseiling Disk, Tottenham Hotspur Ground

Completed abseiling platform designed and installed on top of the new Tottenham Hotspur stadium.

Works included:

  • Design and installation of 5.2m structural steel ring clad in stainless steel.
  • Assembled in our Corby factory and delivered by specialist transport and police escort.
  • Onsite installation, lifted 58m and installed on top of new Tottenham stadium.

Value

£45k

Stratford Multi Story Car Park, London Olympic Park

Developed, designed and installtion of bespoke steel and aluminium ‘ Pyramid ‘ cladding system.

Works included:

  • 3D surveys and enabling works to existing structure.
  • Primary steel reinforcements.
  • Primary steel, Secondary steel and Aluminium Perforated Plate cladding.
  • Site logistics and lift plans for moving materials with heavy lifting plant and mobile cranes.
  • Lifting/Assembly strategy in confined PC local to public, roads and foot paths.
  • New entrances.

Value

£ 1.2m

Wembley Stadium, Bobby Moore Club

Structural re modeling

The FA commissioned conversion of the Bobby Moore Club from a single to double floor facility.

Works included:

  • Strip out and enabling works
  • Loading and unloading heavy plant and materials in restricted ‘live’ environment
  • Fast track project 8 weeks for works

Value

£ 250k

St. Katharine’s Dock

Reconstruction of a new entry staircase into the docks, with new feature gates to the marina side.

Works included –

  • Complex bespoke bronze fabrications.
  • Lifting and assembly in restricted PC adjacent to very busy public footpaths and River Thames.
  • All fabrications and installations by our own factory and skilled operatives.
  • Site logistics and lift plans for moving materials.
  • Interkey were PC for these works.

Value

£ 150k

Twelve Tree’s Crescent, Bow

External steel stairs and bespoke architectural finishes

Works included –

  • Complex bespoke steel fabrications
  • Lifting and assembly in restricted PC adjacent to public footpaths and canal/river.
  • All fabrications by our own factory and workshop.
  • Site logistics and lift plans for moving materials with heavy lifting plant and mobile cranes on hard ground and from barges.

Value

£ 200k

Tayto Corby

Installation of new £1million Tortilla production line, whilst current operations continued.

Works included –

  • Unload imported plant from containers using heavy lifting gear and cranes.
  • Remove walls within the factory to allow access to designated areas.
  • Supply of all mechanical and electrical connections including gas, air, water etc.
  • Extend existing stainless steel platforms to suit new line.
  • Strengthen roof beams to accommodate new plant.
  • Principle contractor to comply with CDM regulations.

Value

£ 320k

Tayto Scunthorpe Snack Conveyor

Remodelling of existing packing line to facilitate new automated blowline system on snack conveyor

Works included –

  • Complex conveyor line remodelling.
  • Remove existing conveying lines.
  • Install new blow line systems to project snack packets over 100m.
  • Reconfigure box conveyor line
  • Project manage all aspects of installation.

Value

£ 85k

Hereford Road

Type of project

Structural modifications

Works included:

  • Creating new access to building extension
  • Structural re-modelling
  • Integrating into new and existing building structure

Value

£ 80k