View details of some our Contracting Projects
Tottenham Hotspur New Stadium
Construction of bespoke Sky line viewing gallery
Works included installation of:
- Primary Steel
- Secondary Steel
- Glazing
Value
£500k
Twickenham Stadium
Developed, designed and installed bespoke steel structures for stunning new entrances
Works included:
- Design and fabrication of primary, secondary and cladding systems.
- Site logistics, lifting and assembly.
- Detailed interior stainless steel fit – out panelling, integration of MEP services.
- Lifting/assembly strategy in confined PC local to public, roads and foot paths.
Value
£500k
London Olympic Park, Stratford, Copper Box
New green car park with EV charging station
Works included:
- Designed and installed electrical power supplies and substation connection for new EV chargers.
- Civils and groundworks for foundations, data, power and comms networks infrastructure.
- Replacement high level and wall mounted energy efficient exterior lighting.
- Tarmac surfacing and extensive line marking.
- New data and comms networks including reinstallation of ANPR system.
Value
£400k
Echo Packaging
Design and installation of reinforced structural slab
Works included:
- Design and installation of high load pile foundations and reinforced structural slab.
- Design and installation of new connection frame for process material silo.
- Management and lift planning for Silo relocation.
Value
£80k
Abseiling Disk, Tottenham Hotspur Ground
Completed abseiling platform designed and installed on top of the new Tottenham Hotspur stadium.
Works included:
- Design and installation of 5.2m structural steel ring clad in stainless steel.
- Assembled in our Corby factory and delivered by specialist transport and police escort.
- Onsite installation, lifted 58m and installed on top of new Tottenham stadium.
Value
£45k
Stratford Multi Story Car Park, London Olympic Park
Developed, designed and installtion of bespoke steel and aluminium ‘ Pyramid ‘ cladding system.
Works included:
- 3D surveys and enabling works to existing structure.
- Primary steel reinforcements.
- Primary steel, Secondary steel and Aluminium Perforated Plate cladding.
- Site logistics and lift plans for moving materials with heavy lifting plant and mobile cranes.
- Lifting/Assembly strategy in confined PC local to public, roads and foot paths.
- New entrances.
Value
£ 1.2m
Wembley Stadium, Bobby Moore Club
Structural re modeling
The FA commissioned conversion of the Bobby Moore Club from a single to double floor facility.
Works included:
- Strip out and enabling works
- Loading and unloading heavy plant and materials in restricted ‘live’ environment
- Fast track project 8 weeks for works
Value
£ 250k
St. Katharine’s Dock
Reconstruction of a new entry staircase into the docks, with new feature gates to the marina side.
Works included –
- Complex bespoke bronze fabrications.
- Lifting and assembly in restricted PC adjacent to very busy public footpaths and River Thames.
- All fabrications and installations by our own factory and skilled operatives.
- Site logistics and lift plans for moving materials.
- Interkey were PC for these works.
Value
£ 150k
Twelve Tree’s Crescent, Bow
External steel stairs and bespoke architectural finishes
Works included –
- Complex bespoke steel fabrications
- Lifting and assembly in restricted PC adjacent to public footpaths and canal/river.
- All fabrications by our own factory and workshop.
- Site logistics and lift plans for moving materials with heavy lifting plant and mobile cranes on hard ground and from barges.
Value
£ 200k
Tayto Corby
Installation of new £1million Tortilla production line, whilst current operations continued.
Works included –
- Unload imported plant from containers using heavy lifting gear and cranes.
- Remove walls within the factory to allow access to designated areas.
- Supply of all mechanical and electrical connections including gas, air, water etc.
- Extend existing stainless steel platforms to suit new line.
- Strengthen roof beams to accommodate new plant.
- Principle contractor to comply with CDM regulations.
Value
£ 320k
Tayto Scunthorpe Snack Conveyor
Remodelling of existing packing line to facilitate new automated blowline system on snack conveyor
Works included –
- Complex conveyor line remodelling.
- Remove existing conveying lines.
- Install new blow line systems to project snack packets over 100m.
- Reconfigure box conveyor line
- Project manage all aspects of installation.
Value
£ 85k
Hereford Road
Type of project
Structural modifications
Works included:
- Creating new access to building extension
- Structural re-modelling
- Integrating into new and existing building structure
Value
£ 80k