Interkey Contracting has successfully delivered multiple specialist industrial construction projects for Carlsberg, demonstrating our ability to manage complex works within live beverage production environments. Our portfolio of works for Carlsberg includes the Reverse Osmosis Plant Building, Canning Line Installation Works, and the Late Hops Building, with a combined project value of £1.6 million.

These projects highlight our expertise in industrial construction, manufacturing facility upgrades, steel-framed building construction, process facility installation, specialist drainage systems, and turnkey project delivery for the food and beverage sector. Working within highly operational environments requires careful planning, technical coordination and strict control of programme, safety and logistics. Interkey Contracting delivered each project with a focus on quality, compliance and minimal disruption to site operations.

Specialist Construction for Live Beverage Production Facilities

 

Delivering construction works within a live brewery and beverage manufacturing facility requires more than standard building expertise. It demands a contractor with proven experience in industrial project management, construction in live environments, safe phased delivery, and coordination around operational infrastructure.

At Carlsberg, our works ranged from new build industrial facilities through to production support infrastructure and specialist installation packages, all tailored to meet the client’s operational requirements. Across each project, Interkey Contracting provided a practical and solutions-driven approach, ensuring that complex technical challenges were resolved efficiently and construction activities were delivered safely within a sensitive working environment.

Carlsberg Reverse Osmosis Plant Building

Interkey Contracting delivered expert consultancy and turnkey delivery for the construction of a new Reverse Osmosis Plant Building for Carlsberg. Acting as lead contractor, we managed every stage of the project from pre-construction planning and surveys through to design, construction and completion, ensuring the scheme was delivered on programme and to a high industrial specification.

The project involved the design and build of a 20m x 10m x 9m steel-framed structure, complete with insulated cladding and constructed on a deep-piled slab foundation. Groundworks were especially challenging due to the restricted footprint and close proximity to existing infrastructure, requiring a reduced dig excavation strategy and carefully coordinated piling works.

To suit the operational demands of a live beverage production environment, the building incorporated a specialist stainless steel drainage system and a high-performance industrial floor paint system, selected for durability, hygiene and long-term performance. The completed facility provided Carlsberg with a purpose-built processing building capable of supporting critical manufacturing operations.

Despite the engineering and logistical complexity of the scheme, Interkey Contracting completed the project within just 16 weeks, demonstrating our ability to deliver fast-track industrial construction without compromising on safety, quality or programme control.

Key Aspects

 

Fast-Track Industrial Construction: Completed within an ambitious 16-week programme, supporting Carlsberg’s operational requirements and production timelines.

Turnkey Project Delivery: Full-service management from design and pre-construction planning through to construction and handover.

 

Steel-Framed Industrial Building: Purpose-built 20m x 10m x 9m facility with insulated cladding, designed for durability, efficiency and long-term use.

Complex Groundworks and Deep Piling: Reduced dig excavation and deep-piled foundations delivered in a restricted area near live infrastructure.

Specialist Drainage and Flooring Installation: Stainless steel drainage and industrial-grade flooring systems tailored to the demands of a beverage production facility.

Live Site Coordination: All works carefully managed within an operational industrial environment to minimise disruption and maintain safety.

Client

Carlsberg

Total Value

£800k

Programme

16 Weeks

Carlsberg Canning Line Installation Works

Interkey Contracting also delivered specialist canning line installation works for Carlsberg, further strengthening our experience in construction and installation packages within live food and beverage production settings. This project supported the upgrade and development of Carlsberg’s manufacturing capability, requiring careful coordination between construction activities, process requirements and live site operations.

The works involved the installation and integration of infrastructure and support elements associated with the new canning line, with all activities planned to align with operational constraints and minimise downtime. Projects of this nature demand high levels of precision, programme control and communication, particularly where new equipment and associated building works must be delivered around an active production environment.

Our role included coordinating the construction-related works necessary to facilitate the installation, ensuring the surrounding environment, access arrangements, interfaces and supporting systems were all delivered to suit programme and operational needs. By combining industrial construction expertise with practical experience of live manufacturing facility upgrades, Interkey Contracting helped deliver a successful outcome for Carlsberg.

This project demonstrates our ability to support production line installations, factory upgrades, and process-related construction works for clients operating within highly regulated and time-sensitive sectors.

Key Aspects

Live Manufacturing Environment Expertise: Works delivered within an operational beverage production facility, requiring detailed planning and strict coordination.

Support for Production Line Upgrades: Construction and installation support provided to facilitate canning line improvements and site capability expansion.

Minimal Operational Disruption: Activities phased and managed to reduce downtime and maintain continuity across the wider facility.

 

Specialist Industrial Coordination: Close management of access, interfaces, programme sequencing and live operational constraints.

Process Facility Upgrade Experience: Demonstrates Interkey Contracting’s capability in supporting process-led upgrades in industrial and food-grade environments.

Safe and Efficient Delivery: Delivered with a strong focus on safety, quality and programme performance within a technically demanding setting.

Client

Carlsberg

Total Value

£550k

Programme

16 Weeks

Carlsberg Late Hops Building

As part of our ongoing works for Carlsberg, Interkey Contracting also delivered the Late Hops Building, adding further value to the site through specialist industrial building works tailored to the client’s production and operational requirements.

The Late Hops Building formed part of Carlsberg’s wider facility infrastructure, requiring a practical construction solution that aligned with the existing site layout, operations and programme demands. Works of this type require careful attention to detail, strong site coordination and an understanding of how new building infrastructure must integrate with an established manufacturing environment.

Our team managed the project with the same focus on quality, safety and operational awareness that defines all of our work in the industrial and food production sectors. By delivering construction works within an active brewery environment, Interkey Contracting once again demonstrated our ability to deliver specialist facilities that support production processes while maintaining site functionality throughout the programme.

The project reinforces our experience in industrial building construction, beverage production facility upgrades, and specialist contractor-led delivery for live manufacturing sites.

Key Aspects of the Late Hops Building

 

Specialist Industrial Building Delivery: Construction works delivered to support Carlsberg’s wider operational and production infrastructure.

Operational Site Awareness: Managed within a live brewery environment with careful coordination around ongoing site activities.

Tailored Construction Solution: Building works aligned to client requirements, programme constraints and the needs of the live facility.

Strong Programme and Site Management: Efficiently delivered with a focus on safety, sequencing and controlled execution.

Food and Beverage Sector Expertise: Further demonstrates Interkey Contracting’s proven capability within regulated manufacturing environments.

Integrated Facility Improvement: Supports the long-term functionality and operational development of the Carlsberg site.

Client

Carlsberg

Total Value

£250k

Programme

12 Weeks

CLIENTS

CONTACT US
Enquiries

For any enquiries, questions or commendations, please call: 01536 560 550 or fill out the following form

Head Office

Office 4, Corby Enterprise Centre

London Road, NN17 5EU

Contact Us
Construction Project
Stadiums & Venues
Food & Drinks Manufacturing
Industrial Facilities
Commercial Developments
Other
ACCREDITATIONS

Subscribe to Interkey newsletters

bottom of page